EXPLORE OUR LATEST PROJECTS
CRAWLEY WINERY
2021
BOHUNT CLASSROOM BLOCK 2
2016
BOHUNT SIXTH FORM
2017
The £7million winery project in Crawley involved multiple large extensions to the existing structure, including the addition of temperature-controlled storage.
These improvements have allowed the business to grow and produce the quantities necessary to fulfil their increasing demand.
Bohunt School's continual growth in student numbers requires additional classrooms to accommodate the increase in demand.
The new 12-classroom block includes 6 science rooms, 2 IT Suites and 4 general use classrooms. The new block is 2 storeys high, providing 537sqm on each floor. The design of the building was simplified to prioritise expenses for highly functional and spacious classrooms.
The new Sixth Form building is a separate learning environment from the lower school, creating a bridge between secondary education and further education, particularly University life.
The three-storey building provides 824sqm gross area on each floor and accommodates 22 teaching spaces including science rooms, music studios, an IT suite, as well as a drama and lecture theatre.
NEW PROJECT? NOVI PROJECTS.
REFURBISHMENT
Redesigning your existing space to provide the modern facilities you require.
NEW BUILDS
Providing preliminary and detailed designs, construction drawings and applications to planning.
EXTENSIONS
Reviewing your existing site and providing initial design ideas until we create a clear vision for your extension.